maersk-drilling-inspirer-1-156
Wells & HSEQ
bredford dolphin 1180
Decommissioning
topstrip 0014 ps forside-bilde
Reservoir
1dbdce62-2444-11e4-b51c-12313d026081-medium
AGR Consultancy
agr energy web and ppt copy2
Software
816 thumb
Facilities Solutions
agr-tracs-training3
TRACS Training
AGR delivers the northern-most wells in the Barents Sea
Published 28.03.2014
AGR was assigned by OMV to drill a well in the Barents Sea. As a result of establishing different drilling targets and challenging reservoirs, the operation ended with two wells drilled with the Leiv Eiriksson rig.

agr-logo-mainlogo-2012
AGR delivered the Wisting wells with no major delays and excellent results achieved in HSEQ and environmental surveillance. Additionally, the wells appeared to be the northernmost wells drilled in the area and were AGR’s first wells drilled in the Barents Sea.

Wisting wells
Source: Norwegian Petroleum Directorate

Read the case study here.

< Back

Latest news

2016-09-08 — High Quality Real Time Data for Well Design Optimisation, not just Drilling Optimisation
Read More
2016-08-29 — AGR awarded Frame agreement with Det norske for annual reserves review
Read More
AGR. Pioneering Achievments™
© AGR | All rights reserved. 2016. Norway | UK | America | Asia Pacific | UAE | Colombia