maersk-drilling-inspirer-1-156
Wells & HSEQ
bredford dolphin 1180
Decommissioning
topstrip 0014 ps forside-bilde
Reservoir
1dbdce62-2444-11e4-b51c-12313d026081-medium
AGR Consultancy
agr energy web and ppt copy2
Software
816 thumb
Facilities Solutions
agr-tracs-training3
TRACS Training
Third client chooses AGR’s EC-Drill® following Petronas success
Published 17.08.2012
A THIRD major operator will use AGR’s Managed Pressure Drilling system EC-Drill® following its success off Cuba.

ec drill
EC-Drill®
The move follows successful operations for Petronas and another client using EC-Drill®. Petronas has now assigned its contract for the system to the third operator.
 
EC-Drill® is a step-change technology which solves the long-standing challenge of drilling in narrow pressure windows in deep-water wells. It provides a far greater degree of control, enhances safety and enables operators to cost-effectively hit deep targets that would be impractical to reach with more traditional drilling methods.
 
Bernt Eikemo, Vice President Asia Pacific EDS-ORS, part of AGR, said: “We provide a unique solution that is simple to implement in terms of equipment and procedures.
 
“Having delivered excellent results for Petronas and another client, it’s exciting knowing we will be providing the same to our new
EC-Drill® customer.
 
“This significant contract win is another indication that we are moving towards the forefront of the marketplace for managed pressure drilling solutions.” 


< Back

Latest news

2016-09-08 — High Quality Real Time Data for Well Design Optimisation, not just Drilling Optimisation
Read More
2016-08-29 — AGR awarded Frame agreement with Det norske for annual reserves review
Read More
AGR. Pioneering Achievments™
© AGR | All rights reserved. 2016. Norway | UK | America | Asia Pacific | UAE | Colombia