AGR delivers exploration well in Ireland under new regulatory scheme - AGR
Wells & HSEQ
bredford dolphin 1180
topstrip 0014 ps forside-bilde
AGR Consultancy
agr energy web and ppt copy2
816 thumb
Facilities Solutions
TRACS Training

AGR delivers first exploration well under new regulatory scheme in Ireland

The well was drilled in 33.7 days and saved 14% versus AFE.
AGR were contracted by Kinsale Energy to provide full well management services for an exploration well to be drilled in the Celtic Sea, offshore Ireland.

This would be the first well to be drilled in Ireland under the recently updated Irish regulatory regime. The well was planned to intersect two gas targets with potential for pressure depletion. Logistical support was managed in country from a supply base in Cork, with all equipment mobilised from Aberdeen.

  • A full set of detailed authority submissions were delivered in a tight time frame and consents were given
  • The well was drilled in 33.7 days including rig mob/demob
  • Saved 14% versus AFE despite 2.25 days additional scope
  • All technical well objectives delivered
  • 94% operational efficiency, only 0.52 days total NPT for the whole project
  • No logistics related delays. Equipment demobilised, supply base cleared and equipment off-hire within 2 days of rig departing well location
  • Delivered a full set of service contracts that Kinsale Energy can use for future well operations.


Contact us

For more inquiries about Well services, please contact us here.

Latest news

2016-10-13 — AGR announces New Helm of Well Management business in Norway
Read More
2016-10-12 — Knowledge Management in Africa
Read More
AGR. Pioneering Achievments™
© AGR | All rights reserved. 2016. Norway | UK | America | Asia Pacific | UAE | Colombia