Blog - AGR - Upstream Consultancy, Manpower and Software
AGR%20logo%20white%20text%20-%20cropped
maersk-drilling-inspirer-1-156
Drilling & Wells
bredford dolphin 1180
Decommissioning
topstrip 0014 ps forside-bilde
Reservoir
1dbdce62-2444-11e4-b51c-12313d026081-medium
AGR Consultancy
software-menul
Software

AGR Blog

Here is the area where our experts share their thoughts on topics they are passionate about. 
Deterministic vs Probabilistic planning method
24.04.2017

Deterministic vs Probabilistic planning method

The ability to show the management that the calculated well costs are based on realistic operations and prices for services is important as this allows them to see that the risks have also been identified and quantified.
AGR%27s P1 time and cost modelling software enables team collaboration
11.04.2017

AGR's P1 time and cost modelling software enables team collaboration

Improving the decision making  process with probabilistic software
19.03.2017

Improving the decision making process with probabilistic software

AGR Well Management engineering team were assigned to evaluate the best option between different Mobile Drilling Unit (MODU) types.
Well Abandonment - Accurate Costing
04.01.2017

Well Abandonment - Accurate Costing

Our Senior Technical Consultant discusses how probabilistic planning can solve key abandonment challenges.
Probabilistic Planning for More Efficient Well Abandonment
21.07.2015

Probabilistic Planning for More Efficient Well Abandonment

Applying a risk-weighted probabilistic cost and schedule estimation software tool in well abandonment projects could represent a significant progression for more informed decisions.