AGR drills eight production wells in Volve field ahead of budget - AGR - Upstream Services, Training & Software
maersk-drilling-inspirer-1-156
Wells & HSEQ
bredford dolphin 1180
Decommissioning
topstrip 0014 ps forside-bilde
Reservoir
1dbdce62-2444-11e4-b51c-12313d026081-medium
AGR Consultancy
agr energy web and ppt copy2
Software
816 thumb
Facilities Solutions
agr-tracs-training3
TRACS Training
AGR drills eight production wells in Volve field ahead of budget
Published 17.02.2015
AGR was assigned by Statoil to deliver Well Management services for the second drilling campaign in the Volve field.

volveutbygging sleipnerbakgrunn statoilhydro 500
Source: Ptil
The Operations were executed between September 2012 and May 2014. This was the first time Statoil used an independent well management company.

The operation was conducted using Jack-up rig, Maersk Inspirer.

As a result of the Operations, AGR drilled eight wells in 390 days – 85 days ahead of budget in comparison with the 1st drilling campaign. The rig also participated in “Rig of the Month” development and won Best in class award - from being cold rig to 3rd
in 8 months.

Read our case study on Volve operations.

Read all case studies from our projects delivered. 

Contact our Well Management team.

< Back

Latest news

2017-11-08 — AGR Wins Training Contract for Wintershall
Read More
2017-11-02 — MOL Norge selects AGR for well and drilling engineering
Read More
© AGR. All rights reserved 2017. Norway l UK l Americas l Asia Pacific l Middle East l Africa