AGR drills eight production wells in Volve field ahead of budget

Published: 17.02.15

AGR was assigned by Statoil to deliver Well Management services for the second drilling campaign in the Volve field.

volveutbygging_sleipnerbakgrunn_statoilhydro_500
The Operations were executed between September 2012 and May 2014. This was the first time Statoil used an independent well management company.

The operation was conducted using Jack-up rig, Maersk Inspirer.

As a result of the Operations, AGR drilled eight wells in 390 days – 85 days ahead of budget in comparison with the 1st drilling campaign. The rig also participated in “Rig of the Month” development and won Best in class award - from being cold rig to 3rd
in 8 months.

Read our case study on Volve operations.

Read all case studies from our projects delivered. 

Contact our Well Management team.