Production Technology - Reservoir - AGR
Drilling & Wells
bredford dolphin 1180
topstrip 0014 ps forside-bilde
AGR Consultancy
agr energy web and ppt copy2
816 thumb
Facilities Solutions
TRACS Training

Production Technology

Integration of production technology with the subsurface disciplines at the early stage of a field or well development project is crucial for selecting the optimum development concept. We have significant expertise both in these integrated projects and also within the specialist knowledge required, for example in deepwater or HPHT developments.

AGR has experienced production technologists with skills covering:
  • Production Chemistry
  • Well Performance
  • Artificial lift
  • Stimulation
  • Sand Control
  • Stress Analysis
  • Equipment Selection
  • Wellsite Supervision.

By integrating the completion design into the subsurface decisions at a stage when making major decisions such as well locations, well numbers, well trajectories and reservoir targets, significant value can be added by either greater production or lower spend. Connecting inherent subsurface uncertainty through to completion decisions can pay dividends through for example, sand production management or designs for future water or gas shut-off.


For direct enquiries with our experts, please contact:

Craig Webster, UK
Morten Heir, Norway


Latest news

2018-03-14 — Sasol selects AGR’s P1™ and Cost Tracker™ for digital well planning
Read More
2018-03-01 — AGR wins contract for Australia’s first offshore C02 Storage Appraisal Well
Read More
© AGR. All rights reserved 2017. Norway l UK l Americas l Asia Pacific l Middle East l Africa