Blog - AGR - Upstream Services, Training & Software
maersk-drilling-inspirer-1-156
Drilling & Wells
bredford dolphin 1180
Decommissioning
topstrip 0014 ps forside-bilde
Reservoir
1dbdce62-2444-11e4-b51c-12313d026081-medium
AGR Consultancy
agr energy web and ppt copy2
Software
816 thumb
Facilities Solutions
agr-tracs-training3
TRACS Training

AGR Blog

How to turn data into practical actions?
26.06.2017

How to turn data into practical actions?

Software is still only as good as the people using it. The Senior Associate at AGR Software explains in more detail how to manage data to create value.
Deterministic vs Probabilistic planning method
24.04.2017

Deterministic vs Probabilistic planning method

The ability to show the management that the calculated well costs are based on realistic operations and prices for services is important as this allows them to see that the risks have also been identified and quantified.
AGR%27s P1 time and cost modelling software enables team collaboration
11.04.2017

AGR's P1 time and cost modelling software enables team collaboration

Improving the decision making  process with probabilistic software
19.03.2017

Improving the decision making process with probabilistic software

AGR Well Management engineering team were assigned to evaluate the best option between different Mobile Drilling Unit (MODU) types.
Unlocking the value from the 50 years’ old Exploration Data
16.02.2017

Unlocking the value from the 50 years’ old Exploration Data

The Unstructured Data Challenge was launched last year with the aim of proving that modern data and information sciences could extract unstructured data which could be used to create context and clarity by combining it with the structured data.
Data Management for Multidisciplinary Interpretation
13.10.2015

Data Management for Multidisciplinary Interpretation

iQx™ new module GEO adds new functionalities for both geoscientists and petroleum engineers.
30% more efficient upstream operations – a dream or reality?
23.06.2015

30% more efficient upstream operations – a dream or reality?

AGR Expert Opinion: Benefits of software created by the end users meet their requirements and is more efficient

Latest news

2018-08-15 — AGR part of the Buzzard Phase II development team
Read More
2018-05-04 — First End of well report generated from iQx delivered to Norwegian Authorities
Read More
© AGR. All rights reserved 2018. Norway l UK l Americas l Asia Pacific l Middle East l Africa